Thursday, July 30, 2015

All in a Day's Work (Part 2) - Loading small stone onto the barge

A lot of focus has been on the large multi-ton blocks of being used to cap the outside of the Salisbury jetty. Tons of small and medium size has been truck in throughout July. This smaller size stone is being used to fill in between the large blocks and also build up the inner core of the jetty.

The small and medium size stones are handled differently than the large blocks. They are loaded into a large steel bucket with a handle and cross bar at one end.These buckets are filled at the beach staging area along the Merrimack River. Then four cables are attached to the bucket and it is lifted by the crane onto either the stone scowl or the crane barge itself.

In the video, the bucket has already been lifted off the beach and the crane operator is adjusting the height the bucket is suspended at before swinging it over to the stone scowl. I have noticed with both the buckets and the large stone blocks, the cranes only raised them high enough to clear everything on top of the barge. Next in the video, the second crane barge takes the bucket from the scowl and moves it to the deck of its own barge. As it is lowered to the deck, several men help to maneuver it into position. You can see them giving hand signals to the crane operator. 




Four steel cables are used to lift the stone bucket.


Two stone buckets site in the stone scowl.


The small to medium size stones are hauled in by dump truck.

Wednesday, July 29, 2015

All in a Day's Work (Part 1) - Loading Scowl with Large Stones

"All in a Day's Work" will be a five part photo & video essay highlighting the many different operations that occur during a day at the construction site. It will showcase the exciting activities as well as the less glamorous aspects.

The barge cranes equipped with large grapples grab to stones and swing them over the stone scowls. Grabbing this multi-ton stone blocks can be a bit tricky sometimes. As the video shows, the crane operator has to make multiple attempts before he gets a firm grip on some of these stones. He repositions the grapple on the boulder until he can lift the stone without dropping. Sometimes the excavator needs to reposition the stone for the crane operator. Once crane grabs the stone, it is lifted and swung over to scowl. Care is taken not to get the boulder swinging while moving it.



The three crane barges lined up along the beach staging area.


One of the grapples used to pickup large stones with.


The beach staging area is covered with large 10 to 19 ton stone blocks.


Stones lined up in the stone scowl.

Monday, July 27, 2015

Newburyport Birthplace of the U.S. Coast Guard

Newburyport's Yankee Homecoming celebration (July 26-August 2, 2015) will highlight the 225th anniversary of the founding of the U.S. Coast Guard and 100th anniversary of the service being called the "Coast Guard." According to the Yankee Homecoming website:

"On August 4, 2015 the US Coast Guard will celebrate their 225th birthday. This year is special as this is the 100th anniversary of the Coast Guard name, previously known as the Revenue Cutter Service. The US Coast Guard officially began August 4, 1790 when the Tariff Act authorized the building of 10 cutter ships used to enforce the tariff laws. The first of these ships to be commissioned and operated was the Massachusetts which was built in 1791 by the Currier Shipyard in Newburyport. This was the beginning of our history with the Coast Guard which continued with the building of the Custom House in 1835, being named birthplace of the Coast Guard in 1965 by President Johnson, and being name an official coast guard city in 2012."

In celebration of the anniversary I am posting this video of a Coast Guard boat on patrol passing by the north jetty construction site.

Friday, July 24, 2015

Two Aerial Videos of the Salisbury Jetty Construction Site

I thought everyone might enjoy a different "perspective" on the construction site.I found two videos taken from cameras mounted on drones on Youtube. They offer a great top down view of the construction site. The first one was produced by Bright Sky Aerial Photography. It was taken in early June. At this point, only the beginning section of jetty between the beach and the groin had been repaired. Two cranes and three excavators are on site. You will also notice the parking lot is empty. June was on the cooler side this year, and there were very few beach goers at the time.

I recommend clicking on the full screen mode (control on far right) for the best viewing experience.


The second aerial video was produce by UAVLook. It was taken a couple weeks earlier (mid-May ) than the first video. The concrete base for the inner navigational aid tower is still present. It had been removed by the time the other video was taken. In the beginning of the video you can see the excavator loading stones into the bucket of the front end loader. This approach to moving the stones around the site has since been abandoned.

Note: You will have close the popup advertising at the beginning of this video.


Thursday, July 23, 2015

Two Excavators Working on the Outer Jetty

Having observed the Salisbury jetty repairs for a number of weeks now, I am deeply impressed with the skill of the crane and tractor operators, tug boat captains, and the rest of the construction crew. This is a very equipment intensive operation moving thousands of tons of stone. There is a high level of cooperation between everyone. Their safety depends on it. This video shows the first excavator bringing stones dropped onto the jetty by the crane out to a second excavator.  The second excavator moves the stone further out on the jetty. Towards the end of the video, the second excavator places the stone on the top edge of the jetty. The stone is rocking back & forth and the excavator operator gently uses the bottom of the claw to stop the rocking motion to prevent it from falling over. The fine control they have with these huge machines is something to watch.


Wednesday, July 22, 2015

Crane to Excavator on the Jetty

Once the stone scowl is loaded with stones, the scowl and crane barge are moved from the beach staging area out to the jetty. This video shows the white crane unloading the stones onto the Salisbury jetty. An excavator with a claw waits for the crane to deliver the stone and then grabs it. The excavator moves the stone block to pile of stones further out on the jetty. This pile is being used by a second excavator to repair the jetty. You will notice that several black rubber mats are stacked up on the barge. The mats areused on top of the jetty to create a road surface for the excavators to work on. The video was taken from across the Merrimack River on the north end of Plum Island.


Sunday, July 19, 2015

From Truck to Barge

This video illustrates the process of moving the stones from flatbed trucks into the stone scowls used to move the stones out to the Salisbury jetty. When the flatbed trucks arrived they backed out onto the beach. An excavator carefully removes the stones from the truck. Care needs to be taken to get a firm grip on the stone so it will not drop and damage the truck. As the rest of the video shows, dropped stones is a common problem. It doesn't really matter around the rest of construction site, the stone will end up on the sand.

The stones are initially placed in a pile near the trucks. They are subsequently moved by excavator to a stockpile staging area. From there they moved down to the beach along the Merrimack River where a crane picks them up and loads them into a scowl (i.e. barge).


Stone blocks in the stone scowl (barge)


Stockpiled stones waiting to be moved to the beach to be loaded on to the scowl.


A wider view showing the large amount of stone stockpiled.