Shutting Down the Site Series

The final work on the north jetty wrapped up the week of September 14-18. It is was followed by several weeks of dismantling & cleaning up the site, removing tractors, cranes and barges. The hurricane which came up the coast and veered out to sea caused some delays with getting the last two crane barges moved. This is the first in a series of posts documenting the "shutdown" process.

Refueling the Tugboats

The tugboats had been refueled at the construction site during the summer. With the tourist season over, the tugs were able to dock at the public boat ramp at Salisbury Beach State Reservation to refuel.