Photographic documentary of the project to repair the North Jetty at the mouth of the Merrimack River (Salisbury, Newburyport, Plum Island). Photo essay by Mary Gage with additional photos by James Gage.
Monday, June 8, 2015
2nd Crane Barge - Repositioning
After the two anchors posts were setup on the barge, both posts were raised up to allow the barge to be moved to another location at the construction site. The large blue & white tug pulled the barge out from shore. The smaller blue tug boat helped to push the barge sides ways. The small white tug boat eventually comes to assist and push the barge into its new position. I have a few still photos and video showing the barge being repositioned.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment