Photographic documentary of the project to repair the North Jetty at the mouth of the Merrimack River (Salisbury, Newburyport, Plum Island). Photo essay by Mary Gage with additional photos by James Gage.
Thursday, June 11, 2015
Crane Loads Stone into Transport Barge (Video)
This video shows the excavator moving stone blocks to the water's edge at Salisbury beach and a large crane picking up the granite with a grapple and loading it into a transport barge.It takes a lot of skill and patience on the part of the crane operator to position the grapple over the stone block and get a good grip on it so it can be safely lifted off the ground. The grapple is controlled by three cables. There is a lift cable the hoists it up and down. A second cable controls the opening and closing of the hooks of the grapple. A third cable controls the grapple's horizontal position. It pulls the grapple closer to the crane (horizontally) or allows it swing out away from the crane.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment