The crane barge being used to load the stone transport barge was taken out of service for some maintenance work. The doors of two of the cargo containers on the deck were opened out. The grapple had been disconnect from the crane cables.



A large stone bock is sued as a anchor or mooring for the barge.


Blue work tug used to move the barges around.


White tug boat.


I couldn't resist this photo of the two excavator arms.



The tug boat operators takes the time was the windows.